Scroll Top

WORKS

CHARLES DARWIN

CHARLES DARWIN

Hopper Suction dredger with a capacity of 30.500 m3, built by CNN - La Naval for Jan De Nul. This new dredger has been specially designed for operation in shallow or confined waters, reason why it has a full load draft of 13 meters.

Charles Darwin carried out her first dredging works for infrastructure services (port accesses with a turning radius between 11 and 14 meters) in the Port of Itajai, in Santa Catarina (Brazil)

\
Shipowner
Jan of Null
\
Country / Year
Netherlands
\
Shipyard
CNN La Naval
\
Length
183 meters
\
Type
Hopper Suction Dredger
\
Class Notation
Bureau Veritas I✠HULL, ✠MACH HOPPER DREDGER DREDGING WITHIN 15 MIL FROM SHORE OR WITHIN 20 MIL UNRESTRICTED NAVIGATION ✠AUT-UMS CLEANSHIP 7+ ✠DYNAPOS-AM/AT
\
REDCAI works
Installation and commissioning of all navigation and communications equipment. FURUNO Voyager integrated bridge, FURUNO communications.